ELECTRIC ARC FURNACE WATER COOLED ROOF RINGS

Posted by John Bonanno on Jul 7, 2020 8:13:12 AM

The Rose Corporation recently manufactured a 14 foot diameter and an 11 foot diameter replacement "Water Cooled Roof Ring" used on Electric Arc Furnaces.  They are an essential part of the furnace process as a continuous flow of water enters the water jacket, circulates the entire ring and exits in order to keep the roof section of the Electric Arc Furnace cool (see illustration below).

Read More

Topics: welding, industrial fabrication, steel, custom metal fabrication, custom industrial fabrication, contract industrial fabrication

22-1/2 Ton Ladle Lifting Hooks Repair Project

Posted by John Bonanno on Jun 26, 2020 6:44:55 AM
The team at The Rose Corporation recently completed the inspection and replacement of the wear bars on two existing 22-1/2 Ton Ladle Lifting Hooks for a local Steel Mill.  The job requirements included:
  • The inspection of hooks for any loose rivets, which we then removed and replaced if required.
  • The removal of worn wear bars with Arc air.
  • Forming new high strength (A514) wear bars to fit hook shape.
  • The replacement of worn wear bars with new bars, weld and inspect new welds.
Read More

Topics: welding, industrial fabrication, steel, custom metal fabrication, custom industrial fabrication, contract industrial fabrication

Duct Work project sets new standards for The Rose Corporation.

Posted by Elaine McDevitt on Mar 15, 2017 11:00:00 AM

There are two primary differences that set the recent ductwork fabrication job apart from the typical projects manufactured at The Rose Corporation.  It is the first job for which The Rose Corporation held primary responsibility for producing detailed, manufacturing drawings from customer-supplied general arrangement drawings.

Read More

Topics: welding, industrial fabrication, ductwork, duct work, metal, steel